Illustration — DRC-Ceni-Lubumbashi-480-Pinault

Économie - 15 novembre 2025

Diffa Irrigation Modernization

Par Sarah Ndaya2 min de lectureEnglish

The CDA perimeter rehabilitation demonstrates FSSP's development financing potential. The 204-hectare site now supports three annual cropping seasons, with household incomes increasing from 180,000 to 420,000 CFA Francs annually, reflecting transformative impact in an economically marginalized region.

Solar-powered pumping reduces operational costs while enhancing climate resilience. The Presidential inspection of drainage systems highlighted technical competence extending beyond ceremonial functions.

À lire aussi